This is the second wastewater treatment plant that EcobaENT was trusted by VSIP after the project was successful in Hai Phong. This plant is expected to be completed and put into operation in March 2018, meeting the demand of wastewater treatment for VSIP Hai Duong Industrial Zone, phase 1 and phase 2 reserve. 

Investor:
VSIP Hai Duong Ltd., Co.
Location:
VSIP Industrial Zone, Cam Giang District, Hai Duong
Completion time:
2017 - 2018
Contractors:
Ecoba Environmental Technology Co., Ltd
Package:

• Design and construction 
• Equipment supply, product fabrication, installation, testing, operation
• Training, technology transfer