VSIP Hai Duong Industrial Zone Waste Water Treatment
Plant - 5.000 CMD
VSIP Hai Duong Ltd., Co.
This is the second wastewater treatment plant that EcobaENT was trusted by VSIP after the project was successful in Hai Phong. This plant is expected to be completed and put into operation in March 2018, meeting the demand of wastewater treatment for VSIP Hai Duong Industrial Zone, phase 1 and phase 2 reserve.
• Design and construction
• Equipment supply, product fabrication, installation, testing, operation
• Training, technology transfer