• Tam Thang 2 Industrial Zone WasteWater Treatment Plant
    - 1.000 CMD

    Capella Quang Nam Joint Stock Company

  • Tam Thang 2 Industrial Zone WasteWater Treatment Plant - 1.000 CMD

Wastewater treatment station Phase 1 of Tam Thang 2 industrial zone with a total capacity of 1,000 m3 / day, night by EcobaENT, designed and constructed for construction in Tam Thang commune , Tam Ky City, Quang Nam. The project started on March 13, 2019, will apply the modern wastewater treatment technology as Physics and AO combination and is expected to be completed and put into operation in November 2019 with waste water quality after treatment. to achieve QCVN on industrial waste water No. 40: 2011 / BTNMT-column A, meeting the demand of wastewater treatment for Tam Thang 2 Industrial Park.

Investor:
Capella Quang Nam Joint Stock Company
Location:
am Thang, Quang Nam Province
Completion time:
2019
Contractors:
Ecoba Environmental Technology Co., Ltd
Package:

• Technology Design

• Construction

• Equipment supply, installation, testing, operation

• Training, technology transfer, discharge permit