Tam Thang 2 Industrial Zone WasteWater Treatment Plant
- 1.000 CMD
Capella Quang Nam Joint Stock Company
Wastewater treatment station Phase 1 of Tam Thang 2 industrial zone with a total capacity of 1,000 m3 / day, night by EcobaENT, designed and constructed for construction in Tam Thang commune , Tam Ky City, Quang Nam. The project started on March 13, 2019, will apply the modern wastewater treatment technology as Physics and AO combination and is expected to be completed and put into operation in November 2019 with waste water quality after treatment. to achieve QCVN on industrial waste water No. 40: 2011 / BTNMT-column A, meeting the demand of wastewater treatment for Tam Thang 2 Industrial Park.
• Technology Design
• Construction
• Equipment supply, installation, testing, operation
• Training, technology transfer, discharge permit