The thermal power plant is constructed following the ODA model with capacity of of 2 x 500 MW CFPP. Hyundai Engineering and Construction Co., Ltd. (hereinafter HDEC, EPC Contractor of the Project) for total engineering works of the project will implement the pile works for the “Mong Duong 1 Thermal Power Plan Project” awarded by Vietnam Electricity (EVN)

Investor:
Viet Nam Electricity (EVN)
Location:
Mong Duong Town, Quang Ninh Province, Vietnam
Completion time:
2015
Contractors:
Hyundai E&C
Package:

 - Steam Turbine Generator for Units 1 & 2
 * Foundations on piles and on rock bed across 10,000m2 footprint area
 * Turbine Generator 3.0m thick mass concrete base, 15m high reinforced concrete columns, 2.4m thick top slab (8,000m3 RC)        
 * Cooling Water (CW) Seal Pit,  Discharge Pit & Discharge Culvert (5,000m3 RC)
 - Cooling Water Intake Pump Station
 * Continuous bored pile retaining wall with 3 No. layers of ground anchor ties
 * Chemical Jet Grouting & deep well dewatering system
 * 13m deep excavation in poor soil & reinforced concrete pump station