Vinh Tan 4 Thermal Power Plant

Vinh Tan 4 thermal power plant (TPP) is government key project, invested by EVN, the one of four projects the Vinh Tan power Center with total capacity of 5600MW. The project is characterested by following features i) the TPP is coal fired with two super critical steam parameter boilers, installed capacity of 1200MW (2x600MW), total generation 7.2Twh per year and total invesment cost of over VND 36,000 billion, ii) the domestic resource proportion for project is very high (nearly 26%), iii) this is the first large TPP designed by domestic consultant company, and iv) the new model of investment arrangement is applied for project implementation.
Investor:                Vietnam Electricity (EVN)
Main Contractor: Doosan Heavy Industries Vietnam Co., LTD
Location:               Vinh Tan commune, Tuy Phong district, Binh Thuan province
Packages:             Construction and completion of civil structure and finishing works for
1. Cooling Water Intake Pump Station
2. Cooling Water Discharge Channel
3. Cooling Water Inlet Pipeline earthworks
4. RC Foundations for Plant Units
Project status:       Completed 50%