Bay Mau Lake Waste Water treatment Plant
Bay Mau Waste Water Treatment Plant is located in Thong Nhat park, with the total area of 5.000 m2. This is 8th package of Hanoi Drainage Project for Invironmental Improvement- 2nd Project
The capacity of this WTP is 13.300m3/day,night. To solve al waste water of Hoan Kiem and Hai Ba Trung Distric (around 45.000 people) with the total area of drainage system is 217 Ha.
Investor: Hanoi drainage system project managerment
Main Contractor: Kolon Global Cooperation
Location: Hai Ba Trung Distric, Hanoi, Vietnam
Packages:
1. To supply and install the waste water plant
2. Testing and commisioning
Project status: Completed