BACK TO THE NEWS PAGE

Completion of Installation of Solar Power System in the Saki and Hai Van Plants, Phase 1

Renewable Energy Solutions

26/02/2020

In January 2020, Ecoba completed the installation of solar power system at Saki and Hai Van plants, Phase 1 with a total capacity of 2Mwp, coming into operation.

1. Solar power system on roof of Saki factory:

 

 

2. Solar power system on roof of Hai Van factory:

 

 

Leading the trend of installing solar power systems on roofs are the enterprises, factories and workshops. The enterprises around the world are gradually using solar power to reduce operating costs without relying on grid electricity. Because the cost of electricity used for the enterprises' operations accounts for a very large amount, especially in the manufacturing sector, the increasing electricity price makes it difficult for the enterprises to take initiative in their capital. In addition, using solar power for the enterprises, factories and workshops will contribute to reducing emissions to the environment, protecting the green and clean status for the Earth.

This is possible because the structure of the workshop, plant is often very suitable for installing the solar power systems. The first is the the plant’s roof, usually, the roof is flat, wide and airy, ideal for installing solar panels to collect solar energy, generate the electricity.

Next, the factories and workshops are often located in industrial areas, far from residential areas so that they are not blocked by high-rise buildings and apartment buildings. Collecting sunlight in these areas is very convenient, thanks to that, the solar power system for the enterprises, factories and workshops will generate a large amount of electricity, meeting the demand for operation and production.